Pilot steel-shell foundation being manufactured at the Technip Offshore Finland Mäntyluoto yard. |
|
The steel structure being lifted to sea bottom from Technip Offshore Finland barge Harry. |
|
The pilot wind turbine after Technip Offshore Finland had completed offshore installation works. Siemens supplied the 2.3 MW turbine. |